CAPE ZIRCONA PROJECT OF PANEX

Western Cape · South Africa · Zircon, rutile, ilmenite

A first-quartile zircon and rutile project on South Africa's West Coast.

Cape Zircon is a large, shallow mineral sands deposit in the Western Cape Province, South Africa, discovered and advanced by Panex. A completed Preliminary Economic Assessment outlines a 27-year operation, ready for advancement to the next stage.

Drill rig on red sand at Cape Zircon, with the Atlantic Ocean behind
Resource drilling at Cape Zircon, 2026
27 yearsLife of mine
US$766MPre-tax NPV, 8% real
51%IRR
US$194MCapex
2.2Revenue to cost, 1st quartile

Preliminary Economic Assessment, September 2025. A pre-feasibility study is currently being completed based on a new resource estimate.

Why Cape Zircon

Scale, margin and simplicity in a proven province.

Zircon and rutile carry the value

The non-magnetic concentrate, about 53% zircon and 29% rutile, would earn 77% of forecast revenue.

Simple to mine

Mineralised from surface. Planned load and haul with no pre-strip, at US$5.29* per tonne mined.

*PEA estimate, 2025

Infrastructure in place

Tarred roads, the Sishen-Saldanha railway through the project area, Eskom power nearby, and two export ports within 230 km.

Red aeolian sand on a track through coastal scrub at Cape Zircon
Red aeolian sands at surface
Test pit through the mineralised sands
Test pit, mineralised from surface
Ore train on the Sishen-Saldanha railway passing the project area
Sishen-Saldanha railway, project area

A Panex project

From the team behind Corridor Sands and Kwale.

Cape Zircon is the latest mineral sands project by Panex. Its geologists have found and advanced mineral deposits across Africa since 1987, including some of the region's best-known mineral sands projects. Several resource companies have been built on projects Panex discovered and developed.

Corridor Sands, Mozambique

Ilmenite. Described by Panex as the world's largest ilmenite deposit. Drilled to final feasibility, then sold to WMC/BHP.

Kwale, Kenya

Rutile and zircon. One of five titanium-zircon deposits the Panex team found on the East African coast. Taken into production.

Hillendale and Fairbreeze, South Africa

Mineral sands. Drilled and evaluated, then sold to Iscor. Hillendale fed, and Fairbreeze still feeds, the Empangeni smelter complex in KwaZulu-Natal.

Other projects include gold in Tanzania (Buzwagi and Tulawaka, both sold to Barrick), the RhoVan vanadium mine and Borralha tungsten in Portugal, among 20 past projects. Panex track record

At a glance

Cape Zircon key facts.

ItemCape Zircon
ProjectCape Zircon heavy mineral sands project
LocationWest Coast, Western Cape Province, South Africa
StatusExploration and study stage, not yet mining
Planned productsNon-magnetic zircon and rutile concentrate and crude ilmenite concentrate
Mineral resource for PFS901.4 Mt at 3.44% THM (JORC, Oct 2026), resource drilling completed
Study stagePEA complete (Sept 2025), PFS targeted end March 2027
Life of mine27 years (PEA)
CapexUS$194M (PEA)
Pre-tax NPV (8% real)US$766M (PEA)
IRR51% (PEA)
TenureTwo prospecting rights, 47,966 ha, valid to 31 Oct 2028, automatically renewable for 3 years thereafter
DeveloperPanex
HolderBuchuberg Resources (Pty) Ltd
Corporate advisorQuestco (Pty) Ltd

Location

West Coast, South Africa.

70 km south of Tronox's Namakwa Sands mine, in a province with operating mines and mineral separation plants. Two prospecting rights cover 47,966 hectares south of the Olifants River mouth.

Location and infrastructure
Regional map of the West Coast showing the Cape Zircon deposit, with an inset locating it in South Africa

Path to production

Clear milestones to progress the project.

Completed

JORC resource and PEA

Initial environmental assessment also complete.

Completed October 2026

Resource drilling for PFS

Measured, Indicated and Inferred.

End March 2027

Pre-Feasibility Study

Metallurgical bulk samples and mining study underway.

2027

Mining right application

Submission planned during the year.

31 Oct 2028

Prospecting rights

Valid to this date and automatically renewable for 3 years thereafter.

Questions

Frequently asked questions.

What is Cape Zircon?

Cape Zircon is a greenfield heavy mineral sands project on South Africa's West Coast, at the exploration and study stage and not yet mining, with the intent of producing zircon, rutile and ilmenite concentrate. The project is currently developed by Panex and Buchuberg Resources.

Where is Cape Zircon located?

On the West Coast of South Africa, in the Western Cape Province, 30 km from Lutzville by tarred road and 70 km south of Tronox's Namakwa Sands mine. The Sishen-Saldanha railway passes through the project area.

How large is the Cape Zircon Mineral Resource?

901.4 million tonnes at 3.44% total heavy minerals (JORC, October 2026), of which 76% is Measured and Indicated. It contains about 3.6 Mt of zircon, 3.2 Mt of rutile and 11.8 Mt of ilmenite. Mineralisation remains open to the north and south of the current resource.

What does the Cape Zircon PEA show?

The September 2025 Preliminary Economic Assessment outlines a 27-year operation with US$194M capex, a US$766M pre-tax NPV and a US$556M after-tax NPV at 8% real, and a 51% IRR. These results are to be replaced by the Pre-Feasibility Study currently underway.

Who is behind Cape Zircon?

Panex, the exploration group whose team discovered Corridor Sands in Mozambique and Kwale in Kenya, and the local Sandveld exploration, logistics and legal team. Questco acts as corporate advisor.

How do I access the Cape Zircon data room?

Submit an expression of interest using the form on the Contact us page, or email capezircon@questco.co.za with your name, company and interest in the project. Questco will send you the EOI pack, which includes the non-disclosure agreement (NDA). Once your EOI has been approved and the NDA signed, you will receive your data room login.

Data room

Ready for the next phase.

Companies and institutions evaluating an acquisition or partnership can submit an expression of interest to Questco, corporate advisor to the project, for access to the full PEA, the JORC resource report and supporting data.

Contact us